Fort Wayne Wastewater Treatment Plant Solar Microgrid
Location: Fort Wayne, IN
Electric Plus completed electrical work associated with the Fort Wayne Wastewater Treatment Plant Solar Microgrid project. This project combined renewable energy infrastructure with an existing wastewater treatment facility, introducing additional complexity within an active and highly regulated environment.
The work included installation supporting a floating solar system and associated electrical components designed to enhance energy resilience and sustainability. The team navigated unique construction challenges, including working over water and adapting installation methods in real time to accommodate design adjustments.