Fort Wayne WWTP Solar
New MircoGrid Solar Project
Construction Dates: June 28, 2022 – May 1, 2024
Electric Plus provided the complete electrical infrastructure for the FWCU Solar Microgrid, a multisite renewable energy system connected to a floating solar array featuring 12,390 panels. Our team installed all major power generation components, including combiners, inverters, DCDC converters, a full BESS (Battery Energy Storage System), (2) 3000A switchgear lineups, solar step-up transformers, and medium-voltage switchgear.
The project linked three separate locations into one cohesive microgrid while also supporting the unique installation requirements of a floating solar platform. This system now delivers reliable renewable energy and significantly reduces the facilities’ dependence on utility power.